After all of the planning, permits and engineering had been completed it was time for the swimming pool excavation phase of the Rustic Rock Resort.
After all of the planning, permits and engineering had been completed it was time for the excavation phase of the Rustic Rock Resort.
Every Jim Chandler Pool project starts with an accurate and detailed construction plan. The plan is then drawn to scale with white paint on the jobsite for the owners to see and approve.
The Rustic Rock Resort pool has an in-floor cleaning system and a 24″ raised wall with two 3 ft sheer waterfalls placed on matching outwardly curving radii. Therefore, the excavation needed to be precise. With all of the measurements and the pool layout double checked for accuracy, the crew proceeded to excavate the pool.
Checking the wall thickness, measurements and floor depths as we progressed, at the end of the day we had a beautifully sculptured excavation.